Thursday, October 1, 2020
#2051 Thursday 1st October
We're in Busselton for a break.... we came down on Tuesday and go home tomorrow. Kaylia has been very well behaved and it's made it into a good time.
Saturday, September 26, 2020
#2050 Saturday 26th September
Hmmm..... Interesting! I've noticed lately that when something is happening in the near future, that Kaylia seems to have a built in timer. If she knows... from routine or from being told..... that an event is coming, then she seems to be ready in time. If she's in the bath, then 5 minutes before the car ride, she's showered and waiting. ...... and all this is without any external device or reminder.
Since noticing this I've tested it many times and it's consistently so. I wonder how she does it?
Sunday, September 20, 2020
#2049 Sunday 20th September
It's been a day of routine. sleep in.. ... breakfast..... then off to op shops! Kaylia has restrained her looping this week so she could buy 6 dvds. She was very pleased..... and so were we. Not only does it mean a bit of a rest from the looping, it also means that Kaylia spends the afternoon watching the dvds..... so we get some time where we can do our thing. This means gardening for Naomi and building for me. It's very welcome time.
Friday, September 18, 2020
#2048 Friday 18th September 2020
A major milestone in the project has been passed.... the construction of the stairs.
..... and Teddy approves. He came in and went straight up.
Monday, September 14, 2020
#2047 Monday 14th September 2020
This post is about the "bungalow" that many readers will remember from your time in residence.
Since you were there the room has been moved 3.5metres toward the house and the house roof has been extended to cover the room. The space between the house and the room now has a small balcony at the ground floor level and a larger balcony at the upper floor level.... with a door onto it from the main house and from the upper floor of the bungalow.
.... and inside the room.... looking toward the sink....
The large window has been filled in and a staircase will rise from the new door to the top floor. Looking from the sink end....
The old linings are being gradually removed and a new raised ceiling will be put in. The opening to the left will be the entrance.
I hope you enjoy this progress report.
Saturday, September 12, 2020
#2046 Saturday 12th September
The looping is still a problem..... she's down to one DVD this week.
I've had some fun...... digging with the Kanga..... If it ever rains properly again, we'll have a nice pond down there.
Sunday, September 6, 2020
Subscribe to:
Posts (Atom)