Friday, September 18, 2020

#2048 Friday 18th September 2020

A major milestone in the project has been passed....  the construction of the stairs.

..... and Teddy approves. He came in and went straight up. 

Monday, September 14, 2020

#2047 Monday 14th September 2020

This post is about the "bungalow" that many readers will remember from your time in residence.

Since you were there the room has been moved 3.5metres toward the house and the house roof has been extended to cover the room.  The space between the house and the room now has a small balcony at the ground floor level and a larger balcony at the upper floor level.... with a door onto it from the main house and from the upper floor of the bungalow.

.... and inside the room.... looking toward the sink.... 

The large window has been filled in and a staircase will rise from the new door to the top floor.  Looking from the sink end.... 

The old linings are being gradually removed and a new raised ceiling will be put in. The opening to the left will be the entrance. 

I hope you enjoy this progress report.